The Building Regulations Compliance Platform
“The compliance record your Principal Designer appointment demands.”
One email when we launch. · Join the beta testing programme →
The free project profiler.
Tell us about your building — we tell you which Parts of the Building Regulations apply.
The designer’s early-stage sense-check.
Catch compliance issues before they become costly redesigns.
The Principal Designer compliance platform.
Three modules. Gateway-ready documentation. Golden Thread compliance.
Why Jordi exists
Every notifiable project in England now requires a Building Regulations Principal Designer — a named professional with personal liability who must demonstrate compliance at three regulatory Gateways. Until now, BRPDs have managed this with spreadsheets, annotated PDFs, and email chains. Jordi changes that.
Ask Jordi tells you exactly which Parts of the Building Regulations apply to your project — free, in under two minutes, before design work begins.
Jordi Lite flags Part B and Part M compliance issues at early design stage, when a corridor width is a five-minute fix rather than a three-week redesign.
Module 3 assembles formal compliance drawing sets — floor plan with regulation extract adjacent — in the format the Building Safety Regulator requires.
Every compliance report and drawing set is timestamped, version-controlled, and mapped to the relevant RIBA Work Stage. The audit trail builds itself.
The Act came into full force on 1 October 2023 — the most significant overhaul of UK building regulations since the 1980s. For the first time, a named professional on every notifiable project carries personal legal liability for demonstrating compliance at each regulatory Gateway. No dedicated tool existed for this role. Until Jordi.
Free resources
New dutyholder roles, Gateway submissions, and what changes for every notifiable project in England.
A structured guide to identifying relevant Approved Documents by building type, height, and use class.
Duties, liability, appointment, Gateway obligations, and how it differs from the CDM Principal Designer.
A complete practical guide to what the Building Safety Regulator requires and what causes rejections.
What it requires, who is responsible at each stage, and what it means in practice for the design team.
These guides are being updated ahead of launch. Some content may be incomplete.
Launch notification
Register your email address and we will notify you the moment Jordi goes live. No other emails. No spam.
One email at launch. Unsubscribe any time.
Beta testing programme
We are looking for a small number of building design professionals and Principal Designers to test Jordi on live projects before the public launch. Beta testers get free early access, direct input into the product, and priority onboarding support.
Beta places are limited. We will respond to every application.